新闻资讯

警示桩模具的生产说明

2020-01-21 17:21:08

水泥警示桩是我们经常在公路上看到的一种水泥预制块,他们都是通过警示桩模具制作出来的。这种模具生产的产品经常被放置在各种路口,隔离带,公路的一侧等地方,它对我们的交通起着非常重要的作用。一般在丁字路口或十字路口的四面都会放置上水泥警示桩模具,它的表面会被涂抹上红白相间的颜色,远远的望去都是十分显眼的,这样的颜色让他能够起到更好的警示作用,

Cement warning pile is a kind of cement precast block that we often see on the road. They are all made by cement warning pile mold. The products produced by this kind of mould are often placed at various intersections, isolation belts, one side of the road and other places. It plays a very important role in our traffic. Generally, cement warning stake mould will be placed on the four sides of T-junction or intersection, and its surface will be painted with red and white colors, which are very conspicuous in the distance, so that it can play a better warning role,

在操作警示桩模具进行生产的时候,由于模具的型号比较的小,工人就可以单独来完成他的生产了,这样也是方便了预制件的成型。在制作的时候需要准备好大量的模具,其实更好的方式还是在预制工厂中来进行生产。把脱模剂使用刷子适量的涂刷在模具中,过量的涂刷也会影响到泥浆的成型,并且导致警示桩不能够完整的生产出来。而泥浆可以通过管道或者是其他的工具,慢慢的浇筑在模具中,如果有抹子的话,可以在表面简单的抹平一下,之后将浇筑好泥浆的警示桩模具放置在震动平台的上面,通过平台的高频率震动,泥浆中的气泡就会慢慢的浮出表面,这一步的目的是保证泥浆的细腻,然后就可以进行风干晾晒了。试想一下,如果没有震动这一步的话,浇筑上泥浆直接的进行晾晒,警示桩模具里面的压力升高,气泡就会被挤压出来,这样表面会呈现出一个个难看蜂窝状的孔洞,自然这种状态下的警示桩也是不能够提供给施工方进行施工处理的。

When operating the warning pile mold for production, because the mold model is relatively small, the worker can complete his production alone, which is also convenient for the forming of prefabricated parts. A large number of molds need to be prepared for production. In fact, the better way is to produce them in the prefabrication plant. When the release agent is applied to the mold with a brush, the excessive application will also affect the formation of the slurry, and lead to the incomplete production of the warning pile. The mud can be slowly poured into the mold through pipes or other tools. If there is a trowel, it can be simply trowelled on the surface, and then the mold of the warning pile poured with mud can be placed on the vibration platform. Through the high frequency vibration of the platform, the bubbles in the mud will slowly float out of the surface. The purpose of this step is to ensure the fineness of the mud, Then it can be dried and dried. Imagine that if there is no vibration, the mud will be poured directly for drying, and the pressure in the warning pile mold will rise, and the bubbles will be squeezed out, so that the surface will show a honeycomb like hole, naturally, the warning pile in this state can not be provided to the construction party for construction treatment.

联系方式
ico04
联系人

边经理

ico01
电话

0312-8103818

ico06
手机

18803129528

ico05
QQ

107108222

ico03
邮箱

925474963@qq.com

ico02
地址

河北省保定市清苑区阎庄乡高庄村